BAO VO
BAO VO
gbao.n.vo@gmail.comArchive

Bao Vo · Ann Arbor, Michigan

All selected work

Engineering / 2024

From design to tape-out.

Chip-level test and timing for a shuttle project moving toward real silicon.

Bao’s role

DFT/STA Engineer · Faraday Technology

At Faraday Technology Vietnam, I worked on the test and timing flows that make an ASIC ready for fabrication. My contribution was at the delivery boundary: carrying a requirement through implementation, checking it, and making the handoff clear.

Process
UMC 22nm
Delivery
1.5 months
Evaluation
Top 10%
Bao Vo with colleagues at Faraday Technology Vietnam.
With the Faraday team · Vietnam, 2024

01 / Context

A fabrication deadline makes the work real.

I joined Faraday Technology Vietnam in January 2024 and worked on ASIC shuttle projects through May. The work included a UMC 22nm project and close coordination across engineering teams.

02 / Problem

Testability and timing meet at sign-off.

Design-for-test and static timing analysis are connected delivery responsibilities. Test structures, simulation results, tester patterns and timing checks have to describe a design the team can release with confidence.

03 / What I did

Follow the requirement through the flow.

My responsibilities included DFT insertion, scan and memory-test integration, simulation, pattern delivery for automated test equipment, and timing sign-off. I also maintained Tcl, Perl and C-shell automation and used PrimeTime to investigate timing violations with the physical-design team.

The useful habit was following a requirement through the flow, rather than treating each tool's output as the end of the task.

04 / What mattered

A handoff the next team could trust.

Helped bring one shuttle project to tape-out in 1.5 months.

I helped bring one shuttle project to tape-out within 1.5 months. My director's testimonial records a top-10% performance evaluation and describes my attention to execution detail and communication across teams.

05 / Reflection

Execution is also communication.

A deadline turns coordination into a concrete responsibility. The best handoff leaves the next person with something they can act on.

06 / Selected evidence

The record behind
the work.

The 1.5-month figure describes a shuttle project’s tape-out timeline, not total employment. Internal customer layouts and test patterns are not displayed.

Continue through the work

Circuits for an implantable device

Explore the next project